Q62. NetEco. supports northbound integration, which of the following is not currently supported? ( ).

 
 
 
 

Q63. For an IT load of 80kW, a UPS system of 80kVA can meet the basic needs.

 
 

Q64. The NetEco management system can support deployment on () virtual machine software, and save the procurement of servers through virtualized deployment?

 
 
 
 

Q65. Regarding the intelligent battery management in UPS5000-A, the following statement is correct ()

 
 
 
 

Q66. UPS000-E has reliable, efficient and simple design features, then which of the following statements about UPS5000-E-400/500K is true ( )

 
 
 
 

Q67. UPS5000-E only needs to select ( ) to easily realize the N+X power supply system. The operation is simple and convenient.

 
 
 
 

Q68. Which of the following functions need corresponding hardware support? ().

 
 
 
 

Q69. UPS5000-A can significantly reduce the harmonic pollution to the power grid. In the case of linear full load, the input current waveform distortion THDi is

 
 
 
 

Q70. NetEco management system supports reporting alarm information to third-party management system through SNMP interface.

 
 

Q71. The compressor used in the new room-level air cooling is /

 
 
 
 

Q72. PDU8000 precision power distribution cabinet supports monitoring of branch circuit phase current, active power, electric energy and branch circuit switch status.

 
 

Q73. The maximum charging capacity of UPS5000-E is ()

 
 
 
 

Q74. FusionModule800 closed aisle hot and cold aisle are optional

 
 

Q75. If a project needs the management system to monitor the PUE value of the room, what function does NetEco need to quote separately?

 
 
 
 

Q76. The minimum ambient temperature used by FusionModule800 is ( )

 
 
 
 

Q77. Power supply architecture supported by half-cabinet chilled water temperature control ( ).

 
 
 
 

Q78. Suppose a certain battery specification specifies that the discharge power is 400W@ 1.67V @15min, and if the system demand is 1400W. Then the number of battery packs selected is ()

 
 
 

Q79. The UPS5000-(DKVA power module) host has a small footprint, saving space in the computer room. )

 
 
 
 

Q80. UPS2000-A-(1K-3K) output power factor is ().

 
 
 
 

Q81. AHU can be stacked or installed on the roof, flexible deployment ( )

 
 

Q82. The characteristics of the compressor used by Huawei NetCol5000-A include: (multiple choice)/

 
 
 
 

Q83. The output power factor of UPS5000-A-400/500K is ( ), which is suitable for new IT loads and significantly improves the system’s load capacity.

 
 
 
 

Q84. The UPS5000-A supports the adjustable number of battery cells, avoiding the failure of a single battery to cause the replacement of the entire group, and solving the problem of difficult maintenance of traditional UPS batteries ranging from 30 to 40 cells.

 
 

Q85. UPS2000-G is an online double conversion UPS. In normal working state: the mains supply energy, the rectifier converts the alternating current into direct current, and the inverter converts the rectified direct current into pure alternating current and provides it to the load, The charger charges the battery pack ()

 
 

Q86. The RS485 expansion card in the ECC500 collector can provide 5 RS485 interfaces, and each interface can provide 12V DC output.

 
 

By passing the Huawei H19-371_V1.0 certification exam, candidates can demonstrate their expertise in digital power technologies and enhance their credibility and reputation in the industry. The certification can also help professionals advance their careers and increase their earning potential. Overall, the Huawei H19-371_V1.0 certification is a valuable asset for anyone who wants to excel in the field of digital power and stay ahead of the competition.

The Huawei H19-371_V1.0 (HCS-Pre-sales-Digital Power V1.0) Exam is a certification test designed for professionals who are interested in pursuing a career in the digital power industry. This exam is a part of the Huawei Certified Pre-sales Associate- Digital Power certification track and is aimed at validating the candidate’s knowledge and skills related to digital power technologies and solutions.

 

H19-371_V1.0 Sample with Accurate & Updated Questions: https://www.actualpdf.com/H19-371_V1.0_exam-dumps.html

         

Related Links: www.stes.tyc.edu.tw www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below