[Apr 29, 2022] PVIP Exam Dumps PDF Guaranteed Success with Accurate & Updated Questions [Q14-Q37]

4/5 - (1 vote)

[Apr 29, 2022] PVIP Exam Dumps PDF Guaranteed Success with Accurate & Updated Questions

Pass PVIP Exam – Real Test Engine PDF with 72 Questions

NEW QUESTION 14
Which of the following tests measures axial uplift whenperforming load testing of driven-pile foundation members

 
 
 
 

NEW QUESTION 15
A site has a known magnetic declination of 14 west. What should the corrected azimuth reading of the array be in order to be facing true south?

 
 
 
 

NEW QUESTION 16
When performing a system checkout after completing the installation, what is the SAFEST sequence of tasks to detect installation errors before closing any disconnects to the inverter, charge controller, or batteries?

 
 
 
 

NEW QUESTION 17
Insulation resistance testing is being performed on the conductors of a 3-year-old PV system. With a constant high test voltage being applied to a dc conductor, the test results in a high resistance reading. Which does this finding indicate?

 
 
 
 

NEW QUESTION 18
A connector not listed to be used in a concealed location and being used as a disconnect for PV equipment shall comply with which of the following?

 
 
 
 

NEW QUESTION 19
A PV system installation utilizes micro inverters connected to each module of the array. Each micro inverter has a nominal rated output of 250WV. Single phase. The microinverters are listed so that multiple inverters may be connected in parallel to a single feeder circuit, and each inverter has ancable and connector rated for
30A. What is the MAXIMUM number of inverters that may be wired together on a single 30A feeder circuit?

 
 
 
 

NEW QUESTION 20
Which of the following voltages should be included on the dc disconnected label to indicate MAXIMUM system voltage?

 
 
 
 

NEW QUESTION 21
Which circuits are on the utility side of a service point?

 
 
 
 

NEW QUESTION 22
A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner?

 
 
 
 

NEW QUESTION 23
A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:

 
 
 
 

NEW QUESTION 24
Thermal imaging infrared cameras can be used to help find which of the following system operational issues?

 
 
 
 

NEW QUESTION 25
A commercial 600v carport-mounted PV system is installed with rigid running under the parking lot to an inverter pad located at the edge of the parking lot. At what depth below the parkinglot base MUST condult be buried?

 
 
 
 

NEW QUESTION 26
A PV system equipped with rapid shutdown requires a label stating ”RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM”.
Which is the BEST description of where this label is required?

 
 
 
 

NEW QUESTION 27
Which insulation color is allowed for a current-carrying roottop dc conductor on a functionally grounded 6kw PV system?

 
 
 
 

NEW QUESTION 28
With all other environmental parameters being the same, which would be the expected reduction in KM performance of a PV system after an irradiance drop from 810w/m2 to 740w/m2?

 
 
 
 

NEW QUESTION 29
A grid-connected PV system on a dwelling is producing 30% less power than expected. The conductors from threes strings of modules enter into a 3-pole fused dc disconnect, and each ungrounded conductor is connected to a separate pole. On the inverter side of the switch terminals, the three strings are combined. The dc disconnect switch is opened. The voltages on the array side of theswitchare 440 on string #1, 444V on string
#2, and 0V on string #3. The dc disconnect is then closed and the inverter resumes operating, still producing about 30% less power than expected. A clamp-on ammeter is used to measure the dc current of each string of each string of modules where they enter the rooftop junction box. The operating currents of each string are
3.9A for string #1, 3 85A for string #2, and 4.3 A for string #3. What is the MOST likely with the system?

 
 
 
 

NEW QUESTION 30
A grounding electrode is required at the location of all ground-mounted and pole-mounted PV arrays. Which typeof grounding electrode is NOT permitted for arrays. Which type of the grounding electrode is NOT permitted for array grounding?

 
 
 
 

NEW QUESTION 31
The NEC requires that PV systems installed on dwellings incorporate which of the following components?

 
 
 
 

NEW QUESTION 32
Inspection of a new PV installation shows that the dwelling uses a galvanized water pipe for its grounding electrode and that the PV system now shares the connection. Which of the following is an acceptable supplemental electrode method to ensure the integrity of having a grounding electrode?

 
 
 
 

NEW QUESTION 33
Most electric service providers require interactive PV equipment to comply with which for interconnection to their distribution grid?

 
 
 
 

NEW QUESTION 34
How should stratification be eliminated in a set of large, stationary, stationary flooded lead-acid batteries?

 
 
 
 

NEW QUESTION 35
A grid-interactive PV system with battery backup is being installed with a ground-mounted PV array located
200 ft, from the inverter and batteries. The dc PV output circuit has overcuit has overcurrent protection rated from 30A. To reduce voltage drop between the array and batteries, the output circuit wire size was determined to be 6 AWG. The fused dc disconnect between the inverted and batteries is rated for 300A. What is the required size of the equipment grounding conductor between the metal battery case and the inverter?

 
 
 
 

NEW QUESTION 36
Which electrical connection requires the use of a torque device to complete the connection per NEC requirements?

 
 
 
 

NEW QUESTION 37
A ground resistance measurement on a newly installed grounding electrode indicates a resistance of 130. The earth connection may be improved by connecting the existing electrode to a:

 
 
 
 

Get New PVIP Certification Practice Test Questions Exam Dumps: https://www.actualpdf.com/PVIP_exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below