Give Push to your Success with Oracle Engineered Systems 1Z0-902 Exam Questions [Q20-Q41]

Rate this post

Give Push to your Success with Oracle Engineered Systems 1Z0-902 Exam Questions

1Z0-902 100% Guarantee Download 1Z0-902 Exam PDF Q&A

What is the exam cost of the Oracle 1Z0-902 Exam

Oracle 1Z0-902 Exam price varies greatly depending on the vendor. The average cost of a bundle is 244.09 USD, which includes the exam and all other materials.

 

Q20. Your customer needs to ensure that their data is available on the Exadata machine during updates. The customer wants to be able to update one server at a time but still be protected against single-node server failure.
What ASM redundancy level should they use?

 
 
 
 
 

Q21. You have configured a multirack Database Machine with two X9M-8 full racks all in a single cluster and storage grid comprising a total of 4 X9M-8 Database servers and 28 X9M-8 Storage servers.
Which two options are true regarding the servers on which Enterprise Manager agents must be deployed in order to monitor all components of this multirack configuration?

 
 
 
 
 
 
 

Q22. You are updating your Exadata X9M-2 Elastic Database Machine with 6 database servers and 12 High Capacity Storage Servers. You will be using patchmgr to apply updates across the entire machine while still maintaining database availability.
Assuming you are driving patchmgr from an external server, which statement is true about the execution phase?

 
 
 
 

Q23. What are two recommended configuration best practices for backup and recovery on Exadata?

 
 
 
 

Q24. Which two statements are correct about adding an additional database server to a physical Exadata X9M Database Machine using Oracle Exadata Deployment Assistant (OEDA)?

 
 
 
 
 

Q25. Which two statements are true about Auto Service Request (ASR) with an Exadata Database Machine?

 
 
 
 
 
 

Q26. Which are two correct statements about backing up Exadata Database Machine?

 
 
 
 
 

Q27. You are providing oversight for the delivery of a new Exadata Database Machine.
1. Stabilize the Exadata Rack.
2. Unpack Oracle Exadata Rack.
3. Review the safety guidelines.
4. Let the Exadata acclimatize for 24 hours.
5. Power on Exadata PDU A.
6. Place Exadata in its allocated space.
7. Power on Exadata PDU B.
What is the correct order of these steps?

 
 
 
 
 

Q28. Which four actions should you take before proceeding with applying updates to your Exadata Database Machine?

 
 
 
 
 
 

Q29. I/O performance of the prod database on your Exadata Database Machine has degraded slightly over the past month. The database has been allocated to the OLTP I/O Resource Management (IORM) category.
Which two monitoring tools might be useful in examining I/O performance for the prod database?

 
 
 
 
 

Q30. Which two activities are supported on the storage servers in an Exadata Database Machine?

 
 
 
 
 

Q31. An Exadata X9M-2 Elastic Rack with 4 Database Servers and 8 HC Storage Servers and 3-phase 24kVA PDUs is being installed in a Data Center. However, the Data Center is only providing enough power for a single cable from each PDU. Which statement is correct?

 
 
 
 

Q32. Which two Exadata security features would you configure to control which databases can access which griddisks, when multiple databases share space on your storage servers in an unpartitioned storage grid?

 
 
 
 
 

Q33. You are going to create an ACFS Filesystem for use as a staging area for data loads. Examine the following commands:

What steps and in which order should they be executed?

 
 
 
 

Q34. Which statement is true about the Persistent Memory Commit Accelerator?

 
 
 
 
 

Q35. Which two sections of the AWR report shows statistics for X9M Persistent Memory Cache?

 
 
 
 
 

Q36. Which two of the following network connection types can be deployed on the client network ports of an Exadata X9M-2 Database Server?

 
 
 
 

Q37. Examine this list of software components:
1. Oracle KVM Guest
2. Oracle Enterprise Manager Agent (OMA)
3. ASM instance
4. RDBMS instance
5. Automatic Diagnostic Repository Command Interpreter (ADRCI)
6. CELLCLI
7. Cell Server(CELLSRV)
8. diskmon
9. Restart Server (RS)
10. Management Server (MS)
What is the correct location where these software components can run in the standard Exadata Database Machine deployment?

 
 
 
 
 

Q38. Which three statements are true about Oracle Configuration Manager (OCM) for an Exadata Database Machine?

 
 
 
 
 
 

Q39. You must drop all celldisks on all the storage servers in an X9M-2 quarter rack as part of a reconfiguration project.
Which three statements describe the account on the storage servers which you should use and the tool that may be used to drop the celldisks?

 
 
 
 
 
 

Q40. You have been tasked with replacing a memory module of an Exadata Storage Server and need to power off the affected storage server. Which two commands must you execute to safely power off the storage server in an Exadata X9M Database Machine?

 
 
 
 
 
 

Q41. You use Enterprise Manager to monitor all the components of your Exadata Database Machine.
Recently, you discovered that certain asmdisks were offline in one of the diskgroups used by the rac database called prod.
In which two sources would you find diagnostic messages related to this problem?

 
 
 
 
 

Get 1Z0-902 Actual Free Exam Q&As to Prepare Certification: https://www.actualpdf.com/1Z0-902_exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below