[Sep 29, 2025] AACE-PSP Test Prep Training Practice Exam Questions Practice Tests [Q37-Q58]

4/5 - (1 vote)

[Sep 29, 2025] AACE-PSP Test Prep Training Practice Exam Questions Practice Tests

Exam Questions Answers Braindumps AACE-PSP Exam Dumps PDF Questions

The AACE-PSP certification exam is designed to assess the knowledge and skills of individuals who are involved in project scheduling and planning. AACE-PSP exam covers a range of topics, including project planning and scheduling, cost estimating and budgeting, risk management, and project control. Planning & Scheduling Professional (PSP) Exam certification process requires candidates to have at least four years of industry experience and a bachelor’s degree or equivalent work experience.

 

NO.37 An earned value-based project control system can use either of which two budgets as the basis of its calculations?

 
 
 
 

NO.38 What problems can a soils engineer deal with on a project?

 
 
 
 

NO.39 Which of the following is NOT true?

 
 
 
 

NO.40 Which of the following is NOT required when initially planning a project?

 
 
 
 

NO.41 What is accurate about Activity 7001 in the precedence diagram?

 
 
 
 

NO.42 Theoretically construct a summary activity for activities 6001 through 6003. Identify the governing predecessor and successor activities for the hammock:

 
 
 
 

NO.43 Select the most appropriate explanation for use of a winter/wet weather seasonal calendar for use in this project?

 
 
 
 

NO.44 You are developing a detailed critical path schedule for a proposed petrochemical plant. The schedule will become a part of the project baseline document, which will be sent to the company’s board of directors for its consideration. What document or resource is likely to be MOST valuable in determining the schedule’s work activity durations?

 
 
 
 

NO.45 These are the activities on the critical path:

 
 
 
 

NO.46 Which of the following statements is true?

 
 
 
 

NO.47 Constraints control events or activities that __________________.

 
 
 
 

NO.48 Budgeted cost of work scheduled is _______________________.

 
 
 
 

NO.49 How many work days does it take to move the product from testing to sale?

 
 
 
 

NO.50 Using the “normal” schedule, if you start Activity 7001 on April 1, 2002, and using a 5-day workweek, what the finish date for Activity 7001?

 
 
 
 

NO.51 Assuming a total of 30 lifts per crane per day, what is the maximum number of lifts that could be accomplished using 3 small tower cranes over a 5-day period?

 
 
 
 

NO.52 Which of the following is NOT required when performing weekly or monthly schedule updates?

 
 
 
 

NO.53 Determine the correct formula and date for the late start for Activity 9001.

 
 
 
 

NO.54 Using the “crashed” schedule, if you start Activity 2002 on August 12, 2001, what is the finish date for Activity 2002?

 
 
 
 

NO.55 If the administrative constraints for developing the precedence diagram, as provided in the contract documents, indicate that no individual construction activities shall have a longer duration of two months, how many activities in the “normal” schedule would be affected?

 
 
 
 

NO.56 If a cost estimate assumes that 240 hours will be expended on a given activity, and the projected crew size expected to perform that activity is 5 personnel working and 8-hour workday, what is the calculated duration for the activity?

 
 
 
 

NO.57 Project delays are best analyzed

 
 
 
 

NO.58 Identify the late finish to develop plans and specs.

 
 
 
 

Download Free AACE International AACE-PSP Real Exam Questions: https://www.actualpdf.com/AACE-PSP_exam-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below